Sunday, January 13, 2008

January 13th, 2008 Update

Here is an update on the house progress, a lot has been occuring in terms of the inside as the past few weeks has concentrated on installation of plumbing, HVAC ducting, electrical and low voltage. In addition, the doors and some of the final windows were installed. As for exterior work, they have been working on putting up the Tyvek wrap and firring strips along with installing cedar trim around the windows. I believe the next step internally will be insulation followed by sheetrock and as far as the exterior they will be proceeding to installing the James Hardie plank.

Enjoy the pictures.









The windows were installed this past week in the upstairs area sitting room and it is such a great view of the river, landscape and wildlife.





The two views from these windows, first looking north towards the river and the second photo is looking east towards the barn and open field.












Interior pictures of the ductwork, central vacuum piping, electrical wiring, low voltage wiring and recessed lighting:










The tub in the upstairs has been set in place.